S
Spearce
A crack of about 2 metres long 3mm wide has appeared in our floor after the underfloor heating has been switched on. Screed is sand a cement mix by builder on site. Floor area 5 x 6 metres. Screed was drying without heating for 90 days. Heating switched up to temp gradually. The builder also doing the tiling has said this is normal for the floor and can be tiled on. We can not put additional height on the floor as matched with existing floor. Can we lay the stone marble tiles on this? There seems to be no further cracks or movement for the last few days. Any help will be much appreciated.