Looked at this job a few weeks ago after it was installed by a national bathroom company that advertises on tv. Floor was made up 22mm chipboard, They then added 18mm chipboard (the small untreated boards you use in the attic) to make up fall for wet room. Heat mat installed and no tanking. Water pouring through after 2 weeks and its the only bathroom in a forth floor flat. Amazingly, the water was pouring through around the drain.
View attachment 28138 View attachment 28139 View attachment 28140 View attachment 28141
as you can see, they have cut two huge holes in the joist and this has to be replaced. They butchered the floor and just used 3x2 to support the chipboard. They refunded the full cost of the install and an additional amount to have it re-fitted. I had to do a temporary repair until the full re-fit can be done in August as its the only shower in the place for three adults.
Looked at this job a few weeks ago after it was installed by a national bathroom company that advertises on tv. Floor was made up 22mm chipboard, They then added 18mm chipboard (the small untreated boards you use in the attic) to make up fall for wet room. Heat mat installed and no tanking. Water pouring through after 2 weeks and its the only bathroom in a forth floor flat. Amazingly, the water was pouring through around the drain.
View attachment 28138 View attachment 28139 View attachment 28140 View attachment 28141
as you can see, they have cut two huge holes in the joist and this has to be replaced. They butchered the floor and just used 3x2 to support the chipboard. They refunded the full cost of the install and an additional amount to have it re-fitted. I had to do a temporary repair until the full re-fit can be done in August as its the only shower in the place for three adults.