S
ScottG13
Well done. That is one immaculate job. I want a pool. If I ever get one, Dave, got a little job for you :smilewinkgrin:
View all of the UK tiling forum threads, questions and discussions here.
The BIG question is are you willing to take dave on as an apprentice:lol:great work there Dave!! it looks fantastic does your work!!the pool is a bit boring in size and mosaic's IMO but that's nothing to do with youyour work actually makes the job :8:
Dave, Thats a superb job m8, it helps us newbies to see what we should be aspiring to achieve. How long did it take you to do?![]()
About 14 days all in.. but a lot of time was taken up bull nosing and polishing tile edges.
The pool wall was too self level as you see in opening page and an un-coupling membrane used as pot/beam floor and i didn't want lateral stress cracking the stone.
Tanking of the shower wall was done..loads and loads of little finishing bits , so it is time consuming but worth the finished product..