I have done searches but either I'm not searching for the right thing or I'm wearing my blonde wig. Or both!

An existing customer has asked me to price tiling a new conservatory. I have yet to visit the site but the information I have to date is:-

"We estimate that there is about 8” concrete then there are insulation blocks and underfloor heating pipes and then about 4” of screed.
The area is 4.4 metres x 3.3 metres"

At the moment I am assuming that the screed is sand/cement. I have no idea if they want ceramic. porc or stone. I also have no idea at present if the heating has been commissioned.

What length of time is required before tiling? What will be required if the screed is not sand/cement?

Thanks,

Ian
 

Chalker

TF
Arms
Reaction score
628
Points
1,058
Location
Tadcaster
It depends if you force dry the screed after a few weeks.
Basic rule is 1mm a day. So 100 days if your guess in thickness is correct.
But will depend on other factors during that time. For example; warm weather or wet weather will increase/ decrease time. Running dehumidifiers will shorten, but wet trades, like plastering will decrease!
Long and short is. It's dry when it's dry. At that point a moisture test is a must.
 

CJ

TF
Arms
Reaction score
450
Points
1,088
Location
Somerset
Bet the builder has told customer that the "floor is OK to walk on....it's ok to tile"

Heard it so many times from customers.......and some take a hell of a lot of persuasion otherwise.
 

Mouldy

TF
Arms
Reaction score
21
Points
553
Location
Park Gate
OK guys Ill get a bit more info and report back. To be honest a longer time suits because I cant do it until early March!

ETA what % of moisture is indication for OK to tile?
 
Last edited:

Mouldy

TF
Arms
Reaction score
21
Points
553
Location
Park Gate
OK, have visited site. Screed is defo sand/cement and is showing 70% on meter. UFH guy is coming in tomorrow apparently but I'm guessing the 70% is to high to be commissioning the heating? Screed was laid at the beginning of December so has been down for around five weeks or so.
 

Dave

TF
Staff member
Esteemed
Arms
Subscribed
Reaction score
389,895
Points
1,000,000
Location
Co.Durham
OK, so were well past 21 days then. What about the moisture content reading @ 70%?


Its not too bad with those screeds but commissioning the heating will dry it as its been down a while now...

I would however recommend an anti-crack matting as those screeds can be prone to cracking in the first 6 months or so...
 

Reply to Screed Drying Times...... in the Australia Tiling Forum area at TilersForums.com

There are similar tiling threads here

I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
686
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
691
Good morning all. After a little advice. I'll post pictures a bit later. However.... The...
Replies
6
Views
967
Posting a tiling question to the forum? Post in Tilers' Talk if you are unsure which forum to post in. We'll move it if there's a more suitable forum.
Please visit our sponsor websites, they keep the forum free to use!

Advertisement

New Tiling Questions

Replies you've not seen

Top