Please checkout the following advertisement.
Hi All.
Got to admit, having to use S&C to form a wet room floor is a first for me. I Got a call out of the blue from a builder who I have never come across ,quite a few other things setting off alarm bells....... Painter already in an adjoining room,waste pipes at a jaunty angle,promises of we will do this,we will do that.......
but what is the minimum thickness of sand and cement required and how long would this take to dry? Just what to be sure of my facts when I ring him up.
Got to admit, having to use S&C to form a wet room floor is a first for me. I Got a call out of the blue from a builder who I have never come across ,quite a few other things setting off alarm bells....... Painter already in an adjoining room,waste pipes at a jaunty angle,promises of we will do this,we will do that.......
but what is the minimum thickness of sand and cement required and how long would this take to dry? Just what to be sure of my facts when I ring him up.