Hi all. Same wall, customer has asked if I would charge any difference in price between the 2 tile installations above. 8sq m area. I will definitely charge more for the smaller brickbond tiles but the question is, how much? I hate doing brickbond as it takes a lot more time (in my opinion) to prevent lippage etc.

Any thoughts?
 
Wouldnt be chargin the same for porcelain brick bond versus Ceramic normal bond, as I dont really do day rate.

So do you guys charge the same for Ceramic/Porcelain, Normal bond/Brick bond?
 
where did the op say anything about porcelain?, i assumed it was cermic.......or am i missing sumit.....im not as young as i used to be lol..
 
Didnt mention what it was mate, was just wondering if folk adjusted there prices for diffrent variables or everythin was on a day rate?
 
I very rarely charge by the metre, but if I do ceramic is cheapest, porcelain is a tenner more and stone is a tenner more than that.
 
Both options are ceramic. The reason for my query is it takes a lot longer to lay 50 tiles brickbond per square metre than it does to lay, say 12 tiles normally per square metre.
 
A Tenner a day more Bri?

But a day is a day? why more for diffrent tile types but not for layout?

Didnt realise how may folk charged day rate.
 
Both options are ceramic. The reason for my query is it takes a lot longer to lay 50 tiles brickbond per square metre than it does to lay, say 12 tiles normally per square metre.

When I started my boss would fix 21 sq mts of 4 inch tiles in a day.
He wouldn't have been able to fix that many at 12 inches and make a suitably rough job.
I don't think that smaller tiles really take more effort IMHO.
 
When I started my boss would fix 21 sq mts of 4 inch tiles in a day.
He wouldn't have been able to fix that many at 12 inches and make a suitably rough job.
I don't think that smaller tiles really take more effort IMHO.

I dont think the do either but broken bond does take a wee bit more time = ££££££££££ :lol:
 

Advertisement

Thread Information

Title
Difference in price between 100x200 brickbond and 300x200 normal
Prefix
N/A
Forum
UK Tiling Forum
Start date
Last reply date
Replies
17

Advertisement

UK Tiling Forum

Thread statistics

Created
cr0ft,
Last reply from
Gall.B,
Replies
17
Views
480

Thread statistics

Created
cr0ft,
Last reply from
Gall.B,
Replies
17
Views
480
Back