Maybe I've missed something but assuming your door is hinged on the bathroom side, finishing the tiles flush with the door trim is going to mean that the transition strip sits only half under the door. If you'd finished half way into the rebate then the strip would be 100% under the door. Has it been done like that because a bespoke moulding is being used?
Maybe I've missed something but assuming your door is hinged on the bathroom side, finishing the tiles flush with the door trim is going to mean that the transition strip sits only half under the door. If you'd finished half way into the rebate then the strip would be 100% under the door. Has it been done like that because a bespoke moulding is being used?