D
Dougs Third Go
off up to Scotland tomorrow after work to do a 15m2 church vestibule. My mate says floor needs a 25mm slc on average over it, I've worked that out to about 20 bags. The question is, would you tile it the next day?
that's what I'm using Andy, not looking forward to lugging it and 8 bags of addy plus tools all way up there though.Same day with Tilemaster levelflex doug!! IMO.
What SLC you using Doug, Levelflex?
that's what I'm using Andy, not looking forward to lugging it and 8 bags of addy plus tools all way up there though.
no, just me mate. 22mm thick limestone slabs going on floor too.You not got a labourer doug?
that's what I'm using Andy, not looking forward to lugging it and 8 bags of addy plus tools all way up there though.
that was my concern Dave, all I know is that it's grey riven limestone.I think Doug is on about the moisture in an inch of SLC... i have seen thick SLC still sweating the next day... rock hard but still with moisture in it..
What colour limestone is it Doug.?
Glen Lyon fella, just northside of Loch Taywhere abouts in scotia you working, its all pretty wet up here
I go up quite a bit dave, always have to stop at Killin and take a photie of Dochart Falls for my lad,nice bit of the world. trawl loch tay at the start of the season, good for decent springers, also the river dochart is not bad,
weather is looking not bad for the next couple of days