Found this tiling guide on YouTube.

UK Tiling Forum; Established 2006

Welcome to the UK Tiling Forum by TilersForums.com, built in 2006 by Tilers, run by Tilers.

View all of the UK tiling forum threads, questions and discussions here.

is this a joke? primed floor and making dust when cutting tile in the same room, no back buttering tile etc. IT'S RUBBISH
 
My favourite part, besides the 6mm ply on the floor, only primed on the wrong surface, and all the other bad advice, is at 6 minutes 15 seconds. He is laying the last tile from the safety of the bathtub. I guess he had to stay in the bath for 3 hours until the adhesive set... :lol:
 
My favourite part, besides the 6mm ply on the floor, only primed on the wrong surface, and all the other bad advice, is at 6 minutes 15 seconds. He is laying the last tile from the safety of the bathtub. I guess he had to stay in the bath for 3 hours until the adhesive set... :lol:

Didnt listen to his own advice and work towards the door.....but always following manufacturers instructions !....oh yeah how many recommend 6mm ply plonker ?
 
why are you giving us that stress Mike? (with this video clip) :incazzato: :lol: and on weekend

You should think positively Tony. With people like this character out there tiling people's bathrooms it won't be long before they, or their insurance company, get in touch to have you put it right for them :lol:
 
from the bathtub was the funniest bit. :lol: He must have put the bath panel back on, to lay the tiles then removed it before he grouted. Despite the bad advice ya gotta love his accent and enthusiasm. Sponge clod (cloth)
 
So he's managed to put the tile down while he's still in the bath. Strange, cos I thought he put the cistern and pan in the bath !!!!!
 
Last edited:
So he's managed to put the tile down while he's still in the bath. Strange, cos I thought he put the cistern and pan in the bath !!!!!

I'd spotted that too, and there can only be one of two logical reasons.

Either a) it took him more than 1 day to tile what looks like 1½ square metres of floor, and one Day 2 they decided to refit the bath panel before he laid that final tile from the bathtub, or b) they had rigged up a hi-tech pulley system and he was in fact hanging from the ceiling like Tom Cruise in Mission Impossible :lol:
 
I'd spotted that too, and there can only be one of two logical reasons.

Either a) it took him more than 1 day to tile what looks like 1½ square metres of floor, and one Day 2 they decided to refit the bath panel before he laid that final tile from the bathtub, or b) they had rigged up a hi-tech pulley system and he was in fact hanging from the ceiling like Tom Cruise in Mission Impossible :lol:

I'll go for b) Mike as that's the means I use to finish of my bathroom floors. Customers think its great and once the floor is set I get the plasterer in to skim the ceiling with all the holes I've left after the fixings have come out.
 

Advertisement

Thread Information

Title
Found this tiling guide on YouTube.
Prefix
N/A
Forum
UK Tiling Forum
Start date
Last reply date
Replies
15

Advertisement

Tilers Forums Official Sponsors

Thread statistics

Created
Mike Mike,
Last reply from
John Benton,
Replies
15
Views
2,401

Thread statistics

Created
Mike Mike,
Last reply from
John Benton,
Replies
15
Views
2,401
Back