mercedism
Finally got some ply down and am nearly ready for screeding.
Been reading up and i think what i may need is what is referred to as a cold joint.
The plan is to put something along the edges of the ply so we can screed upto it and then when this has gone off remove and fill with the same flexible adhesive i will be using for the tiles?
Screed will be 50mm depth, but what do i use to create the gap and what sort of width should it be? Or if i am heading down the wrong route please advise as would like to get the screeding down at the end of the week.
Pics can be found here as i can't seem to be able to get them on here.
kitchen
Been reading up and i think what i may need is what is referred to as a cold joint.
The plan is to put something along the edges of the ply so we can screed upto it and then when this has gone off remove and fill with the same flexible adhesive i will be using for the tiles?
Screed will be 50mm depth, but what do i use to create the gap and what sort of width should it be? Or if i am heading down the wrong route please advise as would like to get the screeding down at the end of the week.
Pics can be found here as i can't seem to be able to get them on here.
kitchen