Hi Guys,
Wanted to run past the intended process for a bathroom floor project..
First floor bathroom, 1930s house, will be UFH with Porcelain tile. Floor boards need to be ripped up to sort out the plumbing.
Replace with 18mm PLY, glue, screw and prime
6mm Insulation board, with adhesive
Prime Insulation board?
Loose wire Electric UFH
Adhesive and tile
Any better steps to take or parts to improve/add upon?
Cheers!
Wanted to run past the intended process for a bathroom floor project..
First floor bathroom, 1930s house, will be UFH with Porcelain tile. Floor boards need to be ripped up to sort out the plumbing.
Replace with 18mm PLY, glue, screw and prime
6mm Insulation board, with adhesive
Prime Insulation board?
Loose wire Electric UFH
Adhesive and tile
Any better steps to take or parts to improve/add upon?