Wondered what the correct procedure is here..
this is a doorway with timber on the left and concrete on the right, plan is to overboard the lot and have ufh over the timber area only then levelling compound the whole area.
i would think I'd need to create a join with the boards and also install an expansion strip when tiled? but do i just put levelling compound straight over the boards here or somehow create a join with that too?