Discuss Self levelling prior to UFH in the Tiling on Underfloor Heating area at TilersForums. The USA and UK Tiling Forum (Also now Aus, Canada, ROI, and more)




Reaction score
0
I’m nearly there with a bathroom tiling Project and managed to make it this far before getting stumped!

I’ve got Marmox insulation board to lay beneath Warmup DCM-Pro mat. I had planned to use the fleece backed mat with adhesive but I can’t find the mat in the uk. So I’ll have to use the self adhesive mat but it won’t stick directly to the Marmox as it’s too rough.

I’m thinking of using self levelling compound to create a smooth surface and compensate for the adhesive that I don’t need to use.

Will I need to use a perimeter foam strip around the SLC? All the guidance I can find relates to SLC on top of the UFH and it expanding.
 

Reply to Self levelling prior to UFH in the Tiling on Underfloor Heating area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.



Tile Contractor Forum. The useful tile contractor website.

UK Tiling Forum Stats

Threads
67,365
Messages
881,187
Members
9,530
Latest member
Apatel
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks