TF
Thought I was okay with UFH process but now confused! Timber floor was overplyed (18mm), 10mm installation, loose cables, SLC (Fibreplan) put down on Saturday. Ready to tile however spoke to Mapei/Bal re time required for UFH/SLC/adhesive to be all okay to go and was told to gradually heat up SLC for a week or so before tiling? Intended to tile tomorrow!
I thought it was preferable to tile over SLC as soon as poss to avoid any damage etc?
Thanks
I thought it was preferable to tile over SLC as soon as poss to avoid any damage etc?