15217331095401926961831.jpg 15217331521401404198860.jpg Can any give me some advice on how to deal with a problem with a floor in a Victorian house.
The quarry tiles have been lifted and the customer wants to keep the floors level when finished. Here lies the problem as insulation board and ufh (electric) is going down well which means excavating the screed which is only about 25mm then just rubble.
I'm thinking of removing floor plus rubble then sand blinding. Adding dpm insulation board then screeding.before adding insulation board heating cable and latex. I'm fine with all this the bit I can't get my head round is where does the moisture from the floor go? I'm concerned about it being pushed into the walls.
Long winded but I think I'm there. 15217331881632094920063.jpg
 
B

Bill

Try a liquid DPM over the existing base, this will help minimise height constraints. This should only add 12mm to 18mm from where you are now.
 

Bond

TF
Arms
Reaction score
270
Points
518
Location
Highland
A couple of thoughts, semi-dry screed. Or If it’s a smallish area, you could bed 600 x900 precast concrete paving slabs, tape joints and tank. Then add your insulation boards etc. ( not conventional l know).
 

Reply to No damp course under quarry tiles in the Tiling Courses area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

There are similar tiling threads here

Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
535
Good morning all. After a little advice. I'll post pictures a bit later. However.... The...
Replies
6
Views
742
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
585

Advertisement

New Tiling Questions

Replies you've not seen

Top