15217331095401926961831.jpg 15217331521401404198860.jpg Can any give me some advice on how to deal with a problem with a floor in a Victorian house.
The quarry tiles have been lifted and the customer wants to keep the floors level when finished. Here lies the problem as insulation board and ufh (electric) is going down well which means excavating the screed which is only about 25mm then just rubble.
I'm thinking of removing floor plus rubble then sand blinding. Adding dpm insulation board then screeding.before adding insulation board heating cable and latex. I'm fine with all this the bit I can't get my head round is where does the moisture from the floor go? I'm concerned about it being pushed into the walls.
Long winded but I think I'm there. 15217331881632094920063.jpg
 

Reply to No damp course under quarry tiles in the Tiling Courses area at TilersForums.com

There are similar tiling threads here

  • Question
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe had worn away over the past 70 years, causing a small crack in the copper. A plumber/builder fixed...
Replies
1
Views
806
  • Question
Hi, I'm new to the forum and fairly new to tiling, my only previous "proper" job was my recent bathroom (600x600 porcelain, about 25m walls and floors) which went pretty well. I'm now having a go...