Haha throw my diary a bit! Every other job does that! Extras normally, thing is I don't mean two tiles, I mean an extra phase! I arrived on this job to just do outside. I now have repairs to slab and steps to do and insulation boards latexing UFH and kitchen floor tiles added on plus kitchen walls no doubt!
The contractor announced that he'd like me to stick around for 2-3 months, hopping between his various contracts and his own new house no less. I came here for 3 weeks!
I'm booked now til end of September at a rough conservative guess.
Room for the odd little job?...... Only if I phone in sick!
......and this year I was determined to shorten my waiting list after running at min 4 months for the last two years.
I've stopped giving start dates, I try to get the client to accept 'sometime during the month of.........!'
i should consider myself lucky of course, I realise that, but it's damn hard work!