F
Flintstone
I've been to look at a kitchen floor today, 7m, due to an issue with levels the floor has been batternd out and over boarded with chipboard, as it stands it's a disaster, he's layed Ufh on it and slc straight onto the chipboard, no primer, loads of duct tape on the wires, there's creaking. you get the idea!
Anyway, he's taking all the wires up back to the chipboard, gonna screw it every 300 into the batons, then he wants it tiling properly. what's your thoughts on the best way to make it good to tile with Ufh
Anyway, he's taking all the wires up back to the chipboard, gonna screw it every 300 into the batons, then he wants it tiling properly. what's your thoughts on the best way to make it good to tile with Ufh