Hello,
I was wondering if there is a time limit when tiling. I am DIYing my bathroom. So far I have tiled the floor but not grouted. I have also tanked the shower area and primed the plasterboard walls in the rest of the room with Mapai plaster primer. My question is how long can I wait now before continuing? My wife has booked a surprise 2 weeks away and I want to make sure I can leave the job where it is at currently with no adverse consequeences.
Thaks in advance.
I was wondering if there is a time limit when tiling. I am DIYing my bathroom. So far I have tiled the floor but not grouted. I have also tanked the shower area and primed the plasterboard walls in the rest of the room with Mapai plaster primer. My question is how long can I wait now before continuing? My wife has booked a surprise 2 weeks away and I want to make sure I can leave the job where it is at currently with no adverse consequeences.