Q
Qwerty
Crazy paving!!!
View all of the UK tiling forum threads, questions and discussions here.
Bloody hell that's bad!!!
not sure what's worse, the guy who tiled it or the customer who lets it get so bad before thinking maybe it needs rectifying, even more so that it's a wet room, where did they think the water was going???
A bit of both I think! They even said they hope the joists aren't affected!!! It's ok though, they assumed I was free to start work on it next week........more like mid November!
tbh on the face of it the bathroom looked amazing. Since this happened she had been using a guest bathroom , which again looks amazing . The tiles are limestone and since they have been using it every day, the stone is getting stained. It again has a wet room type shower. Having a closer look, most of the tile joints are cracked and a lot are loose. Went downstairs to look under this one and low and behold , new damp patch!So the ceiling below is up the shoot as well then:yikes:
so they think that's a good advert?Honestly, I can't believe it, the customers are really nice, big house, 2 kids,dog ect,and someone does that.
This bathroom is also on there website, how bad is this![]()
And half the photos are out of magazines and kitchen showroom, and they do everything [emoji15]
Honestly, I can't believe it, the customers are really nice, big house, 2 kids,dog ect,and someone does that.
This bathroom is also on there website, how bad is this![]()
And half the photos are out of magazines and kitchen showroom, and they do everything [emoji15]
so they think that's a good advert?
come on, tell us the web site .:sofahide:
How was they allowed to finish it, surely the customer must have been inspecting the work as it progressed FFS.
How do these people get away with it...:mad2: