Hi all 1st post so hope I'm doing it correct
I am tiling a floor in a bathroom and I have laid 12mm wbp plywood and laid electric UHF no the question is do I screed over the UHF mat first then spread tile adhesive and tile or do I just spread adhesive straight over mat and tile also does the plywood need to be primed with Pva? if screed is needed which is best many thanks for relief in advance :smilewinkgrin:
I am tiling a floor in a bathroom and I have laid 12mm wbp plywood and laid electric UHF no the question is do I screed over the UHF mat first then spread tile adhesive and tile or do I just spread adhesive straight over mat and tile also does the plywood need to be primed with Pva? if screed is needed which is best many thanks for relief in advance :smilewinkgrin: