I’m pricing a job which is 26m2 of front garden path to be tiled with old English geometric tiles.
The old concrete path will be taken up, and a new base putting down. I will be getting a firm in to do this work, but I want the best solution for the base, that will take these tiles without future issue.
My thinking is a concrete slab onto hardcore, then a screed top?
I would be grateful for experienced advice on this.
The old concrete path will be taken up, and a new base putting down. I will be getting a firm in to do this work, but I want the best solution for the base, that will take these tiles without future issue.
My thinking is a concrete slab onto hardcore, then a screed top?
I would be grateful for experienced advice on this.