I am tiling a floor for first time on decoupling membrane ( durabase) is it best to lay the decoupling membrane on the whole floor even if I may not tile it all in the same day . Using anhyfix to lay the mat .
 
O

One Day

Not essential but i would. If you need to lift a tile to adjust the bed, it's far better if the mat is stuck down well!
Anhydrite floor? Sanded and vac'd? Moisture levels checked?
 
L

Leory

Y
Not essential but i would. If you need to lift a tile to adjust the bed, it's far better if the mat is stuck down well!
Anhydrite floor? Sanded and vac'd? Moisture levels checked?

Yes anhydrite floor . Moisture levels checked with tramex in the room I'm starting in the levels were .8 in some areas where the screed was a bit thicker . Chose to use anhyfix in this room as tile masters said I could if the level was no more than 1 . Fingers crossed !

Sor
Yes anhydrite floor . Moisture levels checked with tramex in the room I'm starting in the levels were .8 in some areas where the screed was a bit thicker . Chose to use anhyfix in this room as tile masters said I could if the level was no more than 1 . Fingers crossed !

Sorry didn't answer some of your questions . I ground the floor with a diamond grinder and removed all laitance will Hoover again tomorrow before priming .
 
Last edited by a moderator:
O

One Day

Sounds like you'll be good to go... I found anhyfix took 24-48hrs to achieve full bond strength, so the sooner you get it down, the better!
also, there's no real reason to prime but one coat will help with any left over dust.
take care not to over-prime.
 

Ajax123

TF
Esteemed
Arms
Reaction score
931
Points
1,213
Location
Lincolnshire
tramex is no good for measuring screed moisture. should be hygrometer, carbide bomb or gravimetric test. 0.8 on a tramex moisture encounter means pretty much nothing im afraid.
 
G

GoneGuy

Or make your own hygrometer, there is a thread on here.
I made my own one and saved a fortune.

Also if you lay the membrane down in one go and it's a high traffic area might be worth putting boards down to protect it until you tile over it?
 
L

Leory

Hello thanks for your replies . A rep supplied me with the tramex ( adhesive ) not the anhyfix) the screed rep was also going to bring a tramex !! Lol!
 

Ajax123

TF
Esteemed
Arms
Reaction score
931
Points
1,213
Location
Lincolnshire
they are a good survey tool as they give you an indication of where the screed is wettest but are not accurate enough to give a proper reading and as we are dealing with very low moisture contents the inaccruacies are multiplied. a properly calibrated hygrometer used corredtly or better still a carbide bomb is the right tool.
 

Reply to Decoupling membrane in the Canada Tile Advice area at TilersForums.com

There are similar tiling threads here

    • Like
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for...
Replies
1
Views
499
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
622
Good morning all. After a little advice. I'll post pictures a bit later. However.... The...
Replies
6
Views
880
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
656
Hi all. Just wanting some advice and wondering what the pros in here are using nowadays for...
Replies
4
Views
625
Posting a tiling question to the forum? Post in Tilers' Talk if you are unsure which forum to post in. We'll move it if there's a more suitable forum.
Please visit our sponsor websites, they keep the forum free to use!

Advertisement

New Tiling Questions

Replies you've not seen

Top