Jimwilts
If the floor had been walked on after the self level has dried, then yes it would cause slight cracking around the cables. Due to the cable being pushed into the insulation panels slightly.
Thanks for that.
I was thinking the same thing as the airline is directly on top of the cable/tape. I do regret covering all the cable in tape though, but i didn't want the cable to float during levelling.
Im not tiling it until the new year, after they have turned the heating on. Time will tell!
Thanks for all your replies.