Reading a post just now it was stated that a good tiler could be fully booked up 6 months in advanced.
Obviously thats great but what I was wondering is how much work would you be getting through to be booked up that long Like what m2 of tiles would you be fitting on average in a day ?

I'm booking work for September now and on what I call a straight lay job I'd be expecting to prep and fit about 50m2 over two days and is priced per m2. Design work like border motifs and patterns is always estimated and done on a day rate.

Tell me ?
 
T

Time's Ran Out

The title needs to be able to distinguish threads that may have appeared previously with the same wording.
Thus ' vinyl floors ' could be ' vinyl floors prepared and 50 mts laid in 2 days' giving the reader more detail in the tags.
It also allows those of us who have no interest in that subject to completely ignore it!;)
But as usual I may be mistaken and we shall wait for @Dan to tell us.
 

Dan

Admin
Staff member
Reaction score
5,035
Points
1,318
Location
Staffordshire, UK
We have that many threads that repetition is becoming problematic. And longer titles attract more replies.

So I'll change your thread title this once but then will just delete the thread if you use pointless ones in the future.

Have better things to be doing.
 
I

Italy

sorry,
I do not think much to those who say, booked for six months.
6 months ..... then next week, I'm home ....
or they have to do a job, "between" six months?


Or, booked for 6 months and in total work for three months.
They seem to just bar talk. (Here it is said so).
I, the sums, I do it at the end of the year.
ps. I do not remember where I should go to work tomorrow. :)
 

Ttt1601

TF
Esteemed
Arms
Reaction score
400
Points
628
Location
Abbotts Ann, Hampshire
Booked up for 6 months is dependant on circumstances I think in the domestic market it is ny on impossible to be solidly booked that far in front, but the commercial world it's a lot more possible, either way I wouldn't want to be booked that in front constantly, some of the best jobs I get are at a week or months notice, it leav3s the option to pick and choose more, I have stuff booked in for in 8 months time, and have a sh3d load to fit in for the next few months but always find time to get othe4 stuff in that if I want it, as for how many square meters a day, how long is a price of string, 700x 700 recitfied in a massive area laying mostly full tiles and no grinder cuts on a perfectly flat floor lots lol small bathroom full on boxing's windows pigeon holes trims pipes and bad walls, sod all lol hope that helps
 

Reply to what m2 of tiles would you be fitting on average in a day in the Canada Tile Advice area at TilersForums.com

There are similar tiling threads here

Good morning all. After a little advice. I'll post pictures a bit later. However.... The...
Replies
6
Views
832
    • Like
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for...
Replies
1
Views
455
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
596
Hi all. Just wanting some advice and wondering what the pros in here are using nowadays for...
Replies
2
Views
576
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
641
Please visit our sponsor websites, they keep the forum free to use!

Advertisement

New Tiling Questions

Replies you've not seen

Top