S
Spacey
Reading a post just now it was stated that a good tiler could be fully booked up 6 months in advanced.
Obviously thats great but what I was wondering is how much work would you be getting through to be booked up that long Like what m2 of tiles would you be fitting on average in a day ?
I'm booking work for September now and on what I call a straight lay job I'd be expecting to prep and fit about 50m2 over two days and is priced per m2. Design work like border motifs and patterns is always estimated and done on a day rate.
Tell me ?
Obviously thats great but what I was wondering is how much work would you be getting through to be booked up that long Like what m2 of tiles would you be fitting on average in a day ?
I'm booking work for September now and on what I call a straight lay job I'd be expecting to prep and fit about 50m2 over two days and is priced per m2. Design work like border motifs and patterns is always estimated and done on a day rate.
Tell me ?