Search the forum,

Discuss Grouting before toilet installation in the Australia Tiling Forum area at TilersForums.com.

N

newreno

Thanks to some great help from this forum I've managed to finish tiling the walls in my bathroom. Really satisfying feeling and I'm pleased with the result. :thumbsup: Just the grouting, siliconing and the floor to do now.

We had plumbers come in and take the sink and toilet off the walls so that I could tile behind them. They're coming back on Tuesday to replace both. The tiles are big so there are no joins that need grouting behind the sink, but there are some joins behind the toilet. It's a hanging toilet and I've cut neatly around the outlet etc. When the toilet's on the wall it'll cover some of these joins. Do they need to grouted before the toilet goes back in or can they just be left? I'd then grout up to the toilet edge when I do the grouting, but there'd never be any grout behind the 'hanging' part of the toilet.

I'd like to leave the grouting until the end if possible and do it all in one day...
 

Chalker

TF
Arms
Reaction score
628
Points
1,058
Location
Tadcaster
If its a wall hung wc, you would be best grouting behind as there is a lot of pressure on the tiles. They need all the help they can get hope there is a full bed of adhesive behind! If you can fully grout before, its much easier than after the sanitary ware is fitted. Plumber not coming until tues, so plenty of time.
 
Q

Qwerty

I would grout now personally, but as you say, it will be hidden so up to you at the end of the day.
 
N

newreno

Yes, I was extra cautious about getting a good adhesive bed behind. I also made extra sure that the tiles behind the toilet were completely flush so that a good seal could be created once the toilet was installed.

I'm back at work tomorrow but could sort it tonight/tomorrow evening. Could I get away with just doing the tiles behind the toilet for now, leaving the rest for later? I'm not too worried about grouting around the sink before installation as the tiles are 600x600mm and the sink is slap bang in the middle of one (I used the centre of the sink as a datum line).

I just don't want the plumber coming on Tuesday and saying 'Can't do it now. Needs to be grouted first.' I don't have the experience to know if that's likely... The point about the grout giving extra strength for a wall-hanging toilet is a good idea, but it'd be good to only do it on those tiles for now if this won't cause any plumbing issues. :)
 
N

newreno

As chalker says, you have till Tuesday. Why not grout behind wc?

I would've preferred to all the grouting in one go and wasn't sure if it was necessary behind the toilet since it'll be hidden. If it wasn't necessary then I might just have left it. Looks like it adds some strength though, and I can probably also get away with mixing up a small amount of grout and just doing behind the WC.

Thanks lads.
 

Chalker

TF
Arms
Reaction score
628
Points
1,058
Location
Tadcaster
You could just grout behind the toilet for now and do the rest later. But is he fitting anything else? Like shower mixer, screen, towel rail etc. if he is, he could fit these in one visit. If you crack on it will take you 2 -3 hours to do the grouting. It will be better too if the plumber needs to drill near the edge of a tile.
 
N

newreno

He'll be fitting the shower enclosure and a towel rail at some point, but on a future visit. I asked him whether he could fit everything on his next visit when he came to take the sink and WC off the wall, but he said he couldn't fit the shower and rail until the floor was done. I would've made time to do all the grouting if he was fitting everything on Tuesday, but I'd rather enjoy a bit of the weekend now since it's not essential. The stuff about not fitting the shower and towel rail until the floor's in sounded a bit strange, but I guess it's something to do with not making the shower usable before there's a proper floor in place.

I'm not worried about the two visits thing though because I'm not paying for it. It's a rental property where we get a few months rent free for doing renovations, and it's down to the landlord company to pay for all of the plumber's visits. They're okay with multiple visits if necessary as we can't legally be without a sink and toilet in the bathroom.

Looks like next weekend will be spent doing the floor and then I'll finally have a usable bathroom. I'm not looking forward to the floor though as it's really out of level. There's a new chipboard base that's been put down and there are obviously no bumps etc. in that, but the floor falls away gradually over the length of the room (which I've already had to factor into the wall tiling). The room's also full of corners. Nightmare for a DIY-er but I'm enjoying the work.
 
N

newreno

Okay, grouted behind toilet + a few other small areas to use up excess grout. Looking smart. Thanks for the quick replies lads
 

Reply to Grouting before toilet installation in the Australia Tiling Forum area at TilersForums.com

There are similar tiling threads here

I have moved into a new house and want to tile the downstairs bathroom walls. Its not a big room...
Replies
1
Views
369
Hi all, I am planning to tile a full height panel of split face tiles to sit 3” behind a log...
Replies
5
Views
1K
I've got an AKW Tuff form shower tray with a waste that is 10mm above the tray when fully...
Replies
6
Views
1K
Hello there, Relatively recently we had a new en-suite fitted (complete rip out of the old...
Replies
5
Views
2K
    • Like
  • Sticky
Water Damaged Shower Repairs Shower tile repair – water damage – tile waterproofing Do you...
Replies
0
Views
2K
Posting a tiling question to the forum? Post in Tilers' Talk if you are unsure which forum to post in. We'll move it if there's a more suitable forum.
Please visit our sponsor websites, they keep the forum free to use!

Advertisement

New Tiling Questions

Replies you've not seen

Top