F
Flintstone
4 hours is a long time to tank that man!
How long would it take you to tank that?4 hours is a long time to tank that man!
I've not been that lucky, I had to cut one out as it was sticking out the wall about 6/7mmI don't find that an issue, maybe because I've explained to all the plumbers I work with exactly how I want the classi deal fitted and so far so good🙂
How long would it take you to tank that?
Some tanking kits specify 2 coats and for the first coat to be touch dry, so 4 hours is about right for that. 2 hours about right for one coat.Half 8, prime it, cut the tape to length, by 9 your tanking, half 10 your out the door
Lot of factors to consider then like brand, temp., porosity and suchI use tilemaster kit and that's a 2 coat job, first coat dries to touch within 10 mins! Not sure about other brands
Yes, if at all possible. I usually fit this to the prep day, or floor tiling day. In a whole bathroom tiling, you can do at least 2 walls to fill in the rest of the day.That is Mapegum & you couldn't do it in 2hrs as you need to wait till the 1st coat is dry.
I never go to a job just to tank a shower, it's done in conjunction with other jobs.
Tilemaster is 4 hours before tiling so tiling in 2? I wouldn't do it personally. I try to put my 2nd coat on last thing so I can start tiling first thing next day.