Discuss Drying time on a newly cement screed? in the Canada Tile Advice area at TilersForums.com.

Reaction score
1
Points
238
Location
Edinburgh
The screed is 100mm depth,it's a fibreglass/cement screed
custumer thinks 7.5 weeks as advised by Topps
builder said few weeks lol
i thought it was 1mm per day so 100 days,but not sure about it being mixed with fibre glass.
any help please
 

Ajax123

TF
Esteemed
Arms
Reaction score
931
Points
1,213
Location
Lincolnshire
Unless polymer modified the accepted natural drying rate of sand cement screed is 1mm per day. You can overlay it with a liquid damp proof membrane sooner but not if it has underfloor heating. You should not force dry sand cement screeds although a warm dry atmosphere will maximise the rate of drying. Not the best time of year for drying screeds I'm afraid.
 

Reply to Drying time on a newly cement screed? in the Canada Tile Advice area at TilersForums.com

There are similar tiling threads here

I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
682
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
662
Good morning all. After a little advice. I'll post pictures a bit later. However.... The...
Replies
6
Views
932

Advertisement

New Tiling Questions

Replies you've not seen

Top