White Room

Did'nt realise that kind of money was involved, I can see where your coming from now and wish you had mentioned this in your first post it may given different replys to your situation
 
L

Leatherface

Hi Guys,

Understand where you are coming from with your comments - but as you can see I have been stung once - twice shy as the saying goes. I have already spoken to the tilers about doing a contract of works and they are happy with this.

The reason I have posted this is get your guys help to come up with something that is realistic.

ie - the lippage - I am asking what percentage I would be looking at to be reasonable along with other items.

I just want something down in writing to make sure that both ourselves and the tilers are working towards the same thing with no ambiguity.

For example - saying the reason the tiles are spot fixed is because the walls are out - after the job is nearly finished. Mosaics that are going to be 1cm above the bath meaning we would of had 1cm of grout or sealant down to the unless there was going to be a 6mm tile cut!!

I am sure that something like this would be specified by architects. All I want is a level playing field with all expectations laid out at the beginning.

This is going to cost me in the region of £1500 - £2000 to get the room redone - on top of the £1500 it has cost to get to this point. Plus more than likely me working the next 2 or 3 weekends to get the tiles off the wall and the walls made good again. Time I should be spending with my family seeing as though I am away all week.

we are not picky - just want a good job done - not the possible lethal bodge up that we have now.

I hope you guys understand.

Steve
Fair point mate
as long as you can come up with something that is agreeable to both parties, good luck :thumbsup:
 
L

lawrenso

Just another point : " tiler to check walls for level " ?
As a customer expecting a top class job, surely you should check and be responsible for ensuring that the walls are level prior to tiler commencing. You need to give the guy a fighting chance of doing that perfect job :thumbsup:

Hi Leatherface

I know the walls were level before the last tiler started - I done all the prep work! However, nothing was written down - agreed to etc...I need it confirming from them so that cannot be used as an excuse for poor tiling. This is about protecting the tiler as much as me. The tilers have already agreed to come in and do this as well before starting the job - it is just getting it down in writing.

By the way - the tiles are Young Stones from CTD

Steve
 
L

Leatherface

Hi Leatherface

I know the walls were level before the last tiler started - I done all the prep work! However, nothing was written down - agreed to etc...I need it confirming from them so that cannot be used as an excuse for poor tiling. This is about protecting the tiler as much as me. The tilers have already agreed to come in and do this as well before starting the job - it is just getting it down in writing.

By the way - the tiles are Young Stones from CTD

Steve

To be honest, I feel for you mate, you shouldn't be in this situation in the first place
 
L

LM Ceramics

if your new tiler has agreed to a written contract then there should be no problem i understand that youre taking pre cautions due previous experience but i have to agree if a client came to me with a written contract then id be inclined to walk away as it could be more hassel than its worth but i do understand the money you have pay out.

anyway good luck hopefully second time lucky
 
T

tile55

Hi Guys

You may remember my last thread on the bathroom bodge-up. Well we appear to have found some new tilers (Finesse of Chester) however, I want to draw up a contract of works so there can be no disagreement in expectations before, during or after.

We are having 600*300 laid landscape in a standard pattern (no brick bond) with two strips of mosaics running horizontally round the room - one high and one low (see pictures in the thread I mentioned above) and two different colours of the tiles - with the light running through the centre and the mosaics bordering the light.

So - what can I put in a contract. So far I have


3. Lippage of Tiles - What should I put for this??

4. Mosaics are to be flush to surface of tiles - no undulation, standing proud or sunk, and no twisted individual Mosaics.

5. Grouting - Grouting is to be either flush to the face of the tiles or no lower than the slight chamfer on the edge of the tiles. What size grout line would be best with these tiles??


10. An on site inspection of a recent comparable job,


Now what else should I put down - Sealing corners? straightness of tiles - looking to you guys to help me avoid another disaster and need to get this to them by next weekend.

Cheers

Steve

Good luck in getting the best job that you can, obviously you are paying a lot of money hopefully to get a fantastic result, so no one can blame you for being overly critical or demanding, in fact I would expect it. Your home, your job, your money.

Drawing up a contract shows you have the intent to inspect, criticize and demand the highest level of skill possible from your tiler and to me should be standard when tiling any area.
For all those guys advocating a governing body for the tiling industry I would of thought this would be a no brainer as it protects both the tiler and the client, and could be a legally binding contract between 2 parties.

:3 Personally I wouldn't mention the word lippage, if the tiles are tiled properly you wouldn't have any noticable lipage anywhere, and this should be a bare minimum for any tiling install.
Also No. 4 partly covers this and all you would need to do woud be to add that all tiles should be even and level.

:5 Are the tiles 'rectified' if so then maybe a 2mm grout line would suit, which would possibly be the same grout size as the mosaics.
When mixing mosaics with normal tiles Imo it is always best to have the same grout spacing throughout.

Again I wish you all the best and hope everything goes well for you.:16:

This to me, is what makes this forum so special, although not a tiler you have posted quite a few times, asked for and received help and I'm sure that by doing so, you have helped other people aswel -live long and prosper my good man.:thumbsup:
 
Last edited by a moderator:
L

lawrenso

if your new tiler has agreed to a written contract then there should be no problem i understand that youre taking pre cautions due previous experience but i have to agree if a client came to me with a written contract then id be inclined to walk away as it could be more hassel than its worth but i do understand the money you have pay out.

anyway good luck hopefully second time lucky

Hi LM,

I suppose what I am looking at really with this contract is confidence - it is all well and good somebody saying I can do that, but that is all it is - where as when it comes to agreeing to signing a contract - that should weadle out the ones that definately can't cut the mustard. In the end we only want to protect ourselves the best way we can.

Just had an argument with the original tiler while waiting to board the plane this morning - he denies spot-fixing the tiles now....

Still deciding what to to do there.

Thanks for all your support guys - great forum you have here.

Steve
 
D

DHTiling

Just another point : " tiler to check walls for level " ?
As a customer expecting a top class job, surely you should check and be responsible for ensuring that the walls are level prior to tiler commencing. You need to give the guy a fighting chance of doing that perfect job :thumbsup:


It is not upto a customer to say whether the walls or suitable to tile...IMO.

How many times have you turned upto a job and the customer mentioned over the phone etc that the walls have been skimmed/prepped..

Then you turn up and they are nowhere near flat enough, so i think it is a tilers job to check a substrate is good enough for him/her to tile too.

I wouldn't take a customers word for it...




p.s. Good luck steve...Let me know how it goes...i wish i could have come and done it for you but not to be this tme....thanks for the offer though..it's just a shame you have had to undergo this upset.
 

Reply to Contract of works - what should I put in the UK Tiling Forum area at TilersForums.com

There are similar tiling threads here

10 Tiling Tips for Fixing Tiles to Bathroom Walls = From UKTilingForum.co.uk There are a few...
Replies
1
Views
742
    • Like
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for...
Replies
1
Views
513
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
629
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
660
Hi all. Just wanting some advice and wondering what the pros in here are using nowadays for...
Replies
4
Views
664
Posting a tiling question to the forum? Post in Tilers' Talk if you are unsure which forum to post in. We'll move it if there's a more suitable forum.
Please visit our sponsor websites, they keep the forum free to use!

Advertisement

New Tiling Questions

Replies you've not seen

Top