Hello, hoping for some advise
I have removed plasterboard around my shower enclose to add hardiebacker or aquapanel boards. Only problem is on one wall I will be joining one of these boards to existing plasterboard that has been plastered and I will have a 3mm lip between boards.
What’s the best way of levelling out these boards prior to tiling?
Thanks
I have removed plasterboard around my shower enclose to add hardiebacker or aquapanel boards. Only problem is on one wall I will be joining one of these boards to existing plasterboard that has been plastered and I will have a 3mm lip between boards.
What’s the best way of levelling out these boards prior to tiling?
Thanks