hi guys,
what type of screws do i need for overboarding? i have a 22mm thick floorboard and 18mm wbp plywood going on top. the room is about 9ft x 5ft does anyone have a rough guess how many screws i need?
the walls are stripped back to plaster, do i need to prep the walls, floorboards or the ply before i start screwing it down?
to get the paint off the walls i just used an electric planer and it came off in seconds....very dusty though lol
here is an update on walls and pipework so far...
cheers