Discuss My biggest tiling job yet in the Canada Tile Advice area at TilersForums.com.

O

One Day

Carl, you shouldn't be taking on this job, get a pro in.
I took plenty of jobs on in my first few years which you would have said the same about! I did my research, much like Carl is doing here, asked the right questions and did a proper job.
I'd rather see someone like this tackle the job, who cares enough to ask questions, than a 'professional' know it all!
 
J

J Sid

It's been laid since the end of last November so I would assume 50mm drying at 1mm per day it would be more than dry enough. Roughly twice as long as recommended. I will make the suggestion tomorrow when I get to work if you think it should still be checked, but I think they may be expecting me to start it. Again, will it be OK to split it into 4 sections with expansion joints?
so a unheated room?
its not 1mm a day for this type of screed. It's 1mm for the first x mm and .5 mm per day after that at a curtain temp. What's it the the garage over the winter 5• ?

expansion joint is way down the list of questions to be asked
 
C

Carl Haynes

Thank you Impish. I'm beginning to wonder why I even bothered asking questions in the first place.
Julian, the garage has been closed off and industrial heaters left on a low setting for most of the winter.
No I'm not a complete novice and I did ask for advice in layman's terms.
Localtiler was being helpful and now tells me I shouldn't be doing it.
Don't know whether I'm coming or going now.
 
J

Just Rizzle

tiled a kitchen floor with simlar floor make up the guy put a large island with huge granite work surface on it. got a call from the builder 4 mths later as there was several cracks in the tiles running from were the island was sited .i proved that the weight of the island had caused the floor to subside by 8 to 10 mm in the centre of the room.
if you take on this project i would ask for a disclaimer
 
J

J Sid

tiled a kitchen floor with simlar floor make up the guy put a large island with huge granite work surface on it. got a call from the builder 4 mths later as there was several cracks in the tiles running from were the island was sited .i proved that the weight of the island had caused the floor to subside by 8 to 10 mm in the centre of the room.
if you take on this project i would ask for a disclaimer
so you were help responsible for the tile failure then Ray? Yes?
 
C

Carl Haynes

Localtiler, I should be able to get that info tomorrow.
Ray, the sub floor is 6" reinforced concrete and laser levelled and the kingspan is tightly packed in over a damp proof membrane with expansion foam all around the edge. Fairly confident there are no voids but I guess you never know. Having said that, if there are voids isn't it a bit late to deal with them?
 

Ajax123

TF
Esteemed
Arms
931
1,213
Lincolnshire
I'm not kno
Ajax. I was starting to get disheartened about this job until you came along. I can't really get away from doing this job as the guy is one of my bosses. I feel a bit more comfortable after your comments but what about expansion joints in the tiles. Could I get away with tiling it in four sections and would I need a solid bed of adhesive or maybe use a wall trowel notched to10mm deep. Cheers for your input. In fact thanks to everyone who's commented.
knowlegible on trowel size to comment but I would have thought trowel addys on the floor and back butter the tile. In terms of movement joints you should follow the standards which from memory is max bay length 8m max size 40m2. Are you using uncoupling. When doing car showrooms tilers often do so.
 
J

Just Rizzle

so you were help responsible for the tile failure then Ray? Yes?
they tried to put it on me. we took a tile up and running throught the screed was a great big crack and the floor had dropped 10 mmto the side of the island .
we solved the issue by marking out were the legs of the units stood taking out the island and core drilling 70mm holes were the legs stood, so releasing the pressures that the island had created then putting the island back on to the areas drilled were we replaced the king span with 120mm concrete blocks. core drilled out we then replaced the cracked tiles and have had no call backs since that was about 12 yrs ago
 

John Benton

TF
Arms
2,211
1,138
Leeds
O

Old Mod

I think what needs to happen here is everyone just take a deep breath!
There's every chance Carl may have to at least look like he's starting tomorrow and he's being bombarded from all side, not only with different opinions but other spurious conversations that have nothing to do with this thread.
Give the guy a break and lets put together a check list, starting at A and finishing at Z
 
C

Carl Haynes

I think what needs to happen here is everyone just take a deep breath!
There's every chance Carl may have to at least look like he's starting tomorrow and he's being bombarded from all side, not only with different opinions but other spurious conversations that have nothing to do with this thread.
Give the guy a break and lets put together a check list, starting at A and finishing at Z
Thanks 3 fall
 
C

Carl Haynes

I'm not kno

knowlegible on trowel size to comment but I would have thought trowel addys on the floor and back butter the tile. In terms of movement joints you should follow the standards which from memory is max bay length 8m max size 40m2. Are you using uncoupling. When doing car showrooms tilers often do so.
As I said Ajax this is my first job of this size so I don't know what you mean by uncoupling, please explain. Thanks
 

Reply to My biggest tiling job yet in the Canada Tile Advice area at TilersForums.com

Make sure to mark a post as a solution for better transparency.

There are similar tiling threads here

  • Question
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe had worn away over the past 70 years, causing a small crack in the copper. A plumber/builder fixed...
Replies
1
Views
799
    • Like
  • Question
Hi, I am planning on tiling my concrete garage floor with porcelain tiles. The concrete was laid down several years ago by a previous owner, and it looks like it was also polished and sealed -...
Replies
2
Views
1K
  • Question
Hi, I'm new to the forum and fairly new to tiling, my only previous "proper" job was my recent bathroom (600x600 porcelain, about 25m walls and floors) which went pretty well. I'm now having a go...
Replies
3
Views
2K
  • Question
Hi all, I've laid some Arditex NA over the kitchen floor area (not under cabinets. The area is 4.5m x 1.8m. The top third of the room is totally level. The remainder of the room has a slope...
Replies
3
Views
1K
Hello there, Relatively recently we had a new en-suite fitted (complete rip out of the old fittings, and old wall tiles and floor carpet). This consisted of a quadrant shower enclosure, a...