I'm off level 1/8'' over 2' and 1/4'' over 4', from left to right in picture.

Building recessed shower for schluter pan.

What can I use to shim between joists and plywood to level out? Roofing felt? Drywall shims? I need something I can screw through but which won't compress. Looking for ideas less messy/time consuming than self leveler.

Thanks!


20230707_155817.jpg
 
Reaction score
6
Points
88
Location
London
Why not plenty of the multicoloured packers that carpenters use. Then cuts of timber ( with the grain) where it gets too big for packers. Just use them every 6 inches or so for a solid base.
 

Reply to Level Subfloor Under Plywood Before Tiling? in the DIY Tiling Forum area at TilersForums.com

There are similar tiling threads here

Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
600
Good morning all. After a little advice. I'll post pictures a bit later. However.... The...
Replies
6
Views
846
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
645
10 Tiling Tips for Fixing Tiles to Bathroom Walls = From UKTilingForum.co.uk There are a few...
Replies
1
Views
706
    • Like
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for...