P
Paul Sh
Been to look at a mates bathroom tonight and it is riddled with damp (you can even smell it) i told him you cant tile straight to it and that the problem would have to be sorted before any tiling was done, he told me that he had a guy comeing to sort it out, he then asked me how long after the damp was sorted could it be tiled. TBH I don't know, i told him that the guy treating it would give an indication of long it would be. I think it's something i should know, anyone care to enlighten me.