G
GoEasy
Hello all,
Just wanted to thank everyone for their advice I have finally got the bathroom I was after.
By the fourth pic (shower tray on floorboard, the cowboy fitter was fired)
Good guys came in ripped all plaster and floor boards, replaced speed fits with copper pipes, put in noggins between joists before laying down 18mm ply and Cement/Marmox all around and the rest is what you see.
Planning to do Kitchen next.
Just wanted to thank everyone for their advice I have finally got the bathroom I was after.
By the fourth pic (shower tray on floorboard, the cowboy fitter was fired)
Good guys came in ripped all plaster and floor boards, replaced speed fits with copper pipes, put in noggins between joists before laying down 18mm ply and Cement/Marmox all around and the rest is what you see.
Planning to do Kitchen next.
Attachments
-
20130225_131240.jpg71.5 KB · Views: 99
-
20130330_105040.jpg96.4 KB · Views: 95
-
20130403_211857.jpg117.2 KB · Views: 92
-
20130403_211654.jpg116.6 KB · Views: 96
-
20130612_154040.jpg83.9 KB · Views: 96
-
20130816_212201.jpg97.4 KB · Views: 94
-
20130614_142301.jpg75.4 KB · Views: 87
-
20130816_212241.jpg86.3 KB · Views: 89
-
20130816_212421.jpg102.6 KB · Views: 85
-
20130816_212452.jpg89.7 KB · Views: 82
-
20130816_212542.jpg105.9 KB · Views: 87
-
20130816_212605.jpg90.3 KB · Views: 81
-
20130816_212630.jpg100.2 KB · Views: 77
-
20130816_212649.jpg80.8 KB · Views: 75