H
Hanzon
I have just removed tiles from my bathroom walls and have ended up with a right mess. Some tiles came away with all the plaster leaving exposed render. Other tiles left bare plaster and the rest (most) of the tiles left generous amounts of adhesive on the walls. I have stripped away any unsound plaster back to render and propose building up the exposed render (with Bal rapid render) to level out with the surrounding old plaster. And have started to remove the adhesive left after tile removal ( sweat!!) to be left with a reasonable level surface. I would just like some confirmation that the finished result would be ok to tile on. Would you suggest priming the bare plaster areas as well? Anything else I need to do ? Thanks.
.
.