Got a problem with a floor. The floor was fixed Xmas time client was jacked off with the tiler because of the lippage and the fact that the tiler had not sorted the nero Maquina black as requested and consequently laid all the tiles with the most white in at one end of the hall. A galleried landing overlooks the hall and the client says it looked like two different floors from upstairs.
Consequently the tiler came back in 10 days ago and removed 16 of the tiles and replaced them with new ones to even the floor up. (Not the easiest of jobs over UFH) Now the client is jacked off with the lippage and the way they have been sealed over grout haze.
I have been there today to grind, hone and polish a test area and I could not understand why the grout was so soft (The 10 day bit the client decided to tell me in the last 5 minutes before I left).