Hi folks.
I need to box-in the pipes the run around the perimiter of my bathroom floor.
I was thinking of using No-more Nails to stick 2x4 treated timber to the floor, and then screw ply into this to act as the top. These surfaces will then be tiled in the same tiles as the floor.
A few questions:
1) Is this a fairly suitable way of boxing in or are their better ways? How do the Pro's do it ?
2) How should the rough-sawn timber and Ply be prepared, ready to accept tile adhesive ?
Regards
I need to box-in the pipes the run around the perimiter of my bathroom floor.
I was thinking of using No-more Nails to stick 2x4 treated timber to the floor, and then screw ply into this to act as the top. These surfaces will then be tiled in the same tiles as the floor.
A few questions:
1) Is this a fairly suitable way of boxing in or are their better ways? How do the Pro's do it ?
2) How should the rough-sawn timber and Ply be prepared, ready to accept tile adhesive ?
Regards