B
Brad
Hi all
I have been told that new cement/plaster needs 4 to 6 weeks to dry before tiling. Is this the same for leveling compound? or can i tile the next day?
I have been told that new cement/plaster needs 4 to 6 weeks to dry before tiling. Is this the same for leveling compound? or can i tile the next day?