Hi all new to the forum
Advice needed on poured gypsum based floor. First one I've come up against and reading up on them a bit daunting. 80m2 and don't want to screw it up . Under floor heating has been commissioned and the floor has Been down for just short of 6months. I've scrapped most of the top layer off with a wire brush and sander and I am getting ready to prime it. Using a gypsum based flexi floor adhesive and there own primer (they guarantee the adhesive if I use it) but I am now reading that some tilers use a Matt before tiling on to these screeds. Am I missing something it's worrying as can not afford to replace 80m2 of tiling if it goes wrong. Any advice welcome thanks .
Advice needed on poured gypsum based floor. First one I've come up against and reading up on them a bit daunting. 80m2 and don't want to screw it up . Under floor heating has been commissioned and the floor has Been down for just short of 6months. I've scrapped most of the top layer off with a wire brush and sander and I am getting ready to prime it. Using a gypsum based flexi floor adhesive and there own primer (they guarantee the adhesive if I use it) but I am now reading that some tilers use a Matt before tiling on to these screeds. Am I missing something it's worrying as can not afford to replace 80m2 of tiling if it goes wrong. Any advice welcome thanks .