B
BigAl
The plumbers has had to chase out some copper pipes that were laid in my concrete floor. Probably 4 inches deep, and 4 foot long. How do I fill them? The area is in a doorway, so will have heavy traffic. I have a 4-1 readymix bag ready to go - do I need to pva the hole first, or just wet the sides of the hole? Ta.