next

  1. S

    new next to old

    I tiled a black and white path recently where one neighbour had a new path in the style of a black and white victorian path, there was next to no budget so the tiles sourced where a sheeted black and white 48x48mm mosaic with a black 148x148 perimeter tile instead of using the traditional style...
  2. Tony73

    Need tiler to help me next week

    Hi all. I need tiler, to help me next week (for one week, with possibility of getting more projects). To start tuesday or wednesday. I have mosaic tiles, 150x75 ceramic tiles and brick slips to be done in north London. PM me or email: [email protected] Thanks Tony
  3. D

    Everyone getting ready for the olympics next week then? (Excited ?)

    Everyone getting ready and excited for the olympics then.... Excited? At the moment I am not fussed about it BUT I do have tickets to go see the Hockey.... And I have my red shirt - which I had to buy as part of a Stag Doo themed event. Now I am just wearing it like a normal shirt...
  4. D

    Get to use my Sigma 3CK on 60x60 porcs next week.

    Just what i have been waiting for.. 60x60 G5 porcelain job brought forward.. installed insulation boards today and UFH and slc tomorrow. Then onto the Sigma on Monday...:hurray: can't wait to put it to the test and pics for my review..:thumbsup:
  5. D

    What ya tiling next week then..?

    I am doing that wetroom / en-suite in Applestone.. the one with the upside down marmox tray..:lol: All tanked out saturday, so start tiling tomorrow.
  6. D

    Next saturday, be prepared for the plumbers..

    The plumbers had a raid on the sparks forum and we are next, so.... let's give them it both barrels when they dare to invade..:lol: This is the raid of the sparks forum on saturday night.. plumbers/gas fitters/heating engineers bring it on i say... Tilers RULE!
  7. J

    cleaning ivory grout next to sealed porcelin tiles

    ...I tried to talk my wife out of it, but she had to have the light coloured grouting. Anyway the inevitable has happened on our kitchen floor after 6 months and the grouting is looking pretty grubby! I know there are products out there but, I want to make sure I dont I damage/erode the...
  8. D

    What work you got on next week.

    Have we got on next-week then ? i have an outdoor pool in cirencester to tile :thumbsup: i hope the weather stays nice for it as they had a blow-up tent over it, that was taken down as it was to hot !!:yikes:
  9. Tony73

    tiler neded for next week

    Hi all, i need help for next week ( possibly longer) from tuesday in London NW5 area. Mainly marble (some mitred corners). No tools required
  10. A

    Correct way to tile a wall next to a worktop

    Hi im tiling for the 1st time a 2 metre wide wall in the kitchen with 15cm x 15 tiles but the tiles will need to come up to the level of the worktop on my right. I can then continue my tiles around the worktop so the grout lines match at the corner. I know i must start in the middle of the wall...
  11. N

    next leeds manager

    who do we think will be next leeds manager i reckon warnock
  12. M

    What next in the commisioning cycle

    Ok guys. E UFH ran up to 28 deg. Then cooled 2 days before tiling waited 15 days after tiling before running again. Started at 2 deg above ambient and increased by a couple of degrees per day. So now at 30 deg on stat and pretty much the same on the tiles. Whats next. Do we let it cool and run...
  13. G

    Urgently needed tiler in Hove for 20sqm of ceramic wall tiling early next week.

    Hi all If anyone out there has the fortune (or misfortune) of having a couple of days spare early next week in Brighton hove area for the above job. please pm me for details etc. I must move onto my next bathroom and my regular tiler is struggling with his workload also, would be good to have...
  14. D

    What you got to tile next week.(21st november 2011).

    Next weeks big job (240 mtrs) has been pushed back a week , so 2 slate floors squeezed in for me this coming week.. What you got on..?
  15. J

    first B&Q job next week. could be start of alot of work.

    did some work for a bathroom fitting company and they are now trusting me on a B&Q installation. been waiting a couple of week for a CRB check coming through, it has felt like a lifetime. so excited!! finished college in june and i have only had scraps of work, tried offering my services to...
  16. G

    Advice about a tile installation 600 x300 problems, help what do I do next?

    Hi I'm new to this forum. Today our bathroom tiling was completed by our tiler all grouted etc, basically today I questioned the workmanship as I pointed out some raised edges in the shower area, I was told by our tiler that this was due to the tile being bent???, I bit my lip & I didn't say...
  17. G

    Holiday next year.

    I am looking to book a holiday next April for me and the kids (13 and 16) . I would appreciate recommendations for this time of year. Weather of course plays a big part as does the resort being fully open. I am reading lots of reviews and keep seeing that this time of year is still out of...
  18. P

    The next generation

    With all the doom and gloom in the economy today people losing their jobs everyday, what chance do are children stand, my daughter Jessica is sitting her leaving cert this year (equivalent to A levels in uk) And unless she makes good grades, nowadays it seems only A* will do ,,It is putting our...
  19. D

    Next years Holiday.

    It is our 25th wedding anniversary next sept... So for something more relaxing and not hustle of hotels.. we have been looking at a Villa in Cyprus.. A previous customer of mine has this place near Coral bay and it is really nice.. own pool and private parking etc.. So there will 7 of us...
  20. B

    JOB COMPLETE tilers wanted for showroom work next week central london

    2 tilers need for approx 3-4 days next week tiling display boards for showroom in central london. pm me if interested.

Advertisement

Back