Discuss Whatever it takes for preparation in the Canada Tile Advice area at TilersForums.com.

B

Blunt Tool

Been on here a few months now and have noticed some tilers don't do their own preparations, especially walls? I do whatever it needs, even if it means installing extra dwangs to suit Wedi boards, installing Wedi boards, taping, tanking etc same as floors. I'm interested, the tilers who leave it to someone else, I see your point as it's a quicker turnover of job and you can concentrate on just tiling but how do you know it's been done to what you recommend?
 
F

Flintstone

I don't do any wall preperation except tanking. mainly because there is no need for me to do it.
I will avoid any removal of old tiles at all costs because I hate it. Most bathrooms i attend usually are having a rip out and re board. I do want to start offering overboarding with wedi etc, if they want to pay for that.
 
B

Blunt Tool

I don't do any wall preperation except tanking. mainly because there is no need for me to do it.
I will avoid any removal of old tiles at all costs because I hate it. Most bathrooms i attend usually are having a rip out and re board. I do want to start offering overboarding with wedi etc, if they want to pay for that.
So are you happy enough with what has been done normally?
 
W

WetSaw

I do everything myself, haven't found anyone here I can trust. Plus the fact that there's always a surprise waiting for you such as this floor that started off as a simple ufh job... 20170703_164745.jpg
 
W

WetSaw

Concrete blown?

Concrete would have been nice! It's a very weak mortar under which is assorted rubble, pebbles and gravel until you get to the slab. At least it gives me the opportunity to make sure there's a damp course and decent insulation.
 
B

Blunt Tool

50 / 50. I don't don't take on bathroom re fits, usually through a plumber and I walk in and tile.
Yes same Andy don't do plumbing etc, only when there is a leak, but when I quote usually customer tells me joiner is going to put new plasterboard on walls and green plasterboard in the shower. That's when I advise them about paper faced boards and weights and Wedi boards etc so if it's a joiner that has never done this before they will do rip out and plumber will do the new pipe work then I will go in and do the Wedi board installation. Some of the joiners I work with have spent time with me to learn how to install it and I can trust them to get on with it. They actually prefer it as bathrooms are normally smallest places in house and trying to install 2.4metre sheets of plasterboard!
 

Reply to Whatever it takes for preparation in the Canada Tile Advice area at TilersForums.com

There are similar tiling threads here

Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
596
Hi all! Just wondering what the best advice is for book-keeping? Been self employed now for a...
Replies
1
Views
587
Good morning all. After a little advice. I'll post pictures a bit later. However.... The...
Replies
6
Views
827
Hi all. Just wanting some advice and wondering what the pros in here are using nowadays for...
Replies
2
Views
575
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
638
Please visit our sponsor websites, they keep the forum free to use!

Advertisement

New Tiling Questions

Replies you've not seen

Top