how long do you have to wait to grout after tiling when you have tanked the wall first i.m using bal white star
 
P

peckers

Bal white star can be grouted after 24 hrs, however as you have tiled onto the bal tanking and it is impervious to moisture and the white star hasnt got much suction to help it dry out on that substrate then i would tend to leave it another 24 hrs 48 in total as it needs the air getting to it from the open grout joints to dry out. this is only my opinion, if in doubt phone bal technical helpline there no is on the white star tub..
hope this helps steve.....

ps. i presume the right size tiles were used for the bal white star(the use off smaller tiles then the adhesive drys quicker due to more area getting air to it) and that you have used the bal tanking kit?????
 
Last edited by a moderator:

Reply to tanking in the UK Tiling Forum area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

There are similar tiling threads here

Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
509
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
562
Good morning all. After a little advice. I'll post pictures a bit later. However.... The...
Replies
6
Views
709
Hi all. Just wanting some advice and wondering what the pros in here are using nowadays for...
Replies
2
Views
481
This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.
Please visit our sponsor websites, they keep the forum free to use!
Tile Contractor Forum. The useful tile contractor website.

Replies you've not seen

New Tiling Questions

UK Tiling Forum Stats

Threads
67,343
Messages
881,166
Members
9,535
Latest member
Teejay
Top