M
Marvo
Day 2.....sigh...
- Trip to the local rubbish dump to get rid of yesterdays rubble.
- Purchase band aids, Tramedol, kneepads and gloves (and a sausage & egg McMuffin) on the way back home.
- Measure, layout and mark all locations for shower drain, shower taps and plumbing, basin taps and plumbing, glass shower screen etc.
- Excavate through the screed and into slab to allow 800mm Wirquin shower drain pan to be positioned.
- Chase 50mm shower drain into floor and open wall to allow it to drain into external gulley.
- Carefully plane gradual slope towards drain pan into shower floor using jackhammer.
- Cut back plaster and brickwork around window to prevent finished tile level covering the entire wooden window frame.
- Chase walls for plumbing pipes.
- Smooth all walls and floor with a diamond cup-wheel disk to remove high spots.
- Early finish.