H
henrywillicombe
6 days is more than enough in my opinion to do this job. i should do it in less. The client is a friend of my girlfriend. im doing it cheaper so as to do her a favour and not put pressure on myself to work faster and justify my price. i am putting ditra down on top of the slc which is on top of the floor boards. Not ideal as i would like to have it plyed or boarded. i thought it would be okay as i have done the same on jobs that have been run by so called architects and as i said the floor boards are solid. I want this job to be proper so shall i say is has to be boarded or plyed. I have no insurance but will do everything i can to fix any problems but will do my best to make sure none come up. the builder is a close friend of hers and i find it dificult to slag of peoples methods to the customers when in the real world i have seen a lot worse done by so called architects. being asked to schluter 90m of porcelain, let the underfloor heating go on top slc it and then tile the floor is one example that springs to mind. i am competent at tiling stone and wanted to share my job with this forum and see what peoples opinions were in terms of waxing marble. Some replys seem a bit negative, wish i hadnt bothered.