Ive been asked to tile a large floor with a drainage gully at one end. The screed is realitivly flat. Am i right in thinking that the screed should form the fall and i just tile to that? Rather than trying to build up with adhesive.
Also another floor upstairs is plywood with a gully in the middle and this has to be tiled so water runs into the gully . How can this be done?
Any help much appreciated
Thanks
Also another floor upstairs is plywood with a gully in the middle and this has to be tiled so water runs into the gully . How can this be done?
Any help much appreciated
Thanks