Scott

Is there a general drying time for screed?

I have to dig up a bathroom floor and run new drainage and then tile the floor after. I dont know how deep it will have to beyet, thats the main problem but want ot give the customer an idea of how long it will be before we can finish the floor. I have their other bathroom to price as well so that will take at least another 2 weeks. Is there a rule of thumb like plaster at 1mm a day?

Thanks in advance

Scott
 
W

White Room

1mm is the standard drying time but who's going to wait that long, I've used green screed adhesive after a week and believe ditra can be fixed after a couple of weeks
 
D

DHTiling

You could use rapid setting cement.. cures fast and tile quicker..

Or you could use a vapour equalisation membrane like Ditra after around a week..

Apart from that,, it is as you say around 1mm per day
 
S

Scott

Cheers Mark, potentially it could be 600mm deep :thumbsdown:

Mind you it wont be me tiling it will it...!
 
S

Scott

You know what i mean, 600mm overall not all screed! Pipe, shingle, hardcore then screed
 

Reply to Concrete screed drying times in the UK Tiling Forum area at TilersForums.com

There are similar tiling threads here

I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
689
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
694
Good morning all. After a little advice. I'll post pictures a bit later. However.... The...
Replies
6
Views
974
Posting a tiling question to the forum? Post in Tilers' Talk if you are unsure which forum to post in. We'll move it if there's a more suitable forum.
Please visit our sponsor websites, they keep the forum free to use!

Advertisement

New Tiling Questions

Replies you've not seen

Top