Discuss Broken tiles, grout broken, no adhesive stuck to tiles? Floor problem ? in the Adhesive and Grout area at TilersForums. The USA and UK Tiling Forum (Also now Aus, Canada, ROI, and more)

L

Lcliff

Hello
Had extension built and huge floor area laid in
Porcelain tiles, and water/pipe underfloor heating. All grout come out and tiles cracked. Lifted tiles and was shocked no adhesive stuck to tiles. Looks like like laid on chipboard. Am v concerned. No one will retile as said floor problem . Also marble Worksurfaces has dropped few centimetres? Cd b related Ideas ? Thx you

A8CCF210-1488-48E9-BB83-4B80032F0790.jpeg


E009BA2F-A0D5-4518-8955-4C19FE3C141E.jpeg


85361195-936C-4474-8934-98AA55C46899.jpeg
 
H

hmtiling

Not want you want to hear but that floor is beyond remedial repair. Total rip out required.
The small silver lining is the tiles might all be saved
 
Last edited by a moderator:
O

One Day

A heated chipboard floor - not suitable for tiling without proper prep.
Also probably floating construction - definitely not suitable.
You say worktop has shifted. Any pictures?
I am guessing poor building and a floating floor which has sunk.

As above though - complete rip out required although you'll probably find it very easy to save the tiles.
 
O

One Day

The crack in the adhesive bed runs through the adjacent tiles. Almost certainly a joint in the floor boards.
Afraid to say that you have definitely been "had" with this one. A terrible job in every way. :cry:
 

Wayne Brown

TF
Esteemed
Arms
Reaction score
213
Heated chipboard floor ? Unbelievable how is it possible to get it so wrong, as above it will need stripping and reinstating using the correct methods sorry to say . Kop
 
L

Lcliff

Thx you:)
A heated chipboard floor - not suitable for tiling without proper prep.
Also probably floating construction - definitely not suitable.
You say worktop has shifted. Any pictures?
I am guessing poor building and a floating floor which has sunk.

As above though - complete rip out required although you'll probably find it very easy to save the tiles.
 

Bond

TF
Arms
Reaction score
270
Quite a bit of movement going on there, wouldn’t be surprised to find a plumbing/heating leak going on as well.
As others have said a complete rip out and re-do.
 
O

Old Mod

If the floor has dropped below marble worktop areas, there’s a possibility that the slab wasn’t prepared correctly before celotex was laid.
Sometimes if there’s a high point in the slab the weight of the marble counter tops can cause the celotex to break its back, then floor drops as the celotex snaps.
Would definitely say tiles weren’t back buttered first, you wouldn’t see imprint of tile backing if done correctly.
Or heating could have been turned on too soon and up too fast, or tiles could have been contaminated and weren’t cleaned before install.
 

Reply to Broken tiles, grout broken, no adhesive stuck to tiles? Floor problem ? in the Adhesive and Grout area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.
Tile Contractor Forum. The useful tile contractor website.

New Tiling Questions

UK Tiling Forum Stats

Threads
67,363
Messages
881,172
Members
9,534
Latest member
Midland Commercial
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks